Sunday, September 18, 2011

It's moving quickly now. They have got the entire house framed, the roof is shingled, they have installed all the heating and a/c stuff, and they have wired the entire house for electricity. Last week they installed the furnace, poured the front porch and the side porch, and installed the front door.


Oh and they installed the fireplace too!!

Friday, September 9, 2011

September 8, 2011

 Master bedroom looking into the master bathroom with the huge walk in closet to the right.

 Grant standing in what will hopefully be his room.
Cold Storage room
 This will be my scrapbook room (in the basement) Yes it is really as big as it looks!!!
It's starting to look like a house!!!

September 7, 2011

 Standing in the front door looking toward the South
 Here is the front door!

Tuesday, September 6, 2011

Walls

 You can see here they have got some of the walls up. This the front of the house with a window on the right and the front door on the left.
 This is the East side of the house.
And this is the West side of the house.

Sunday September 4, 2011

 There is now a main level floor in the house! (looking South)
 This is the garage in the back of the house. (looking North)